Audit of rail network condition

Audit of the condition of the French national rail network

Client
SNCF Réseau
Location
France
Date
2018, 2022, 2025
Audit of rail network condition triangle
cible

Context and Objectives

Following the Brétigny accident, the Accident Investigation Bureau (BEA-TT) required SNCF Réseau to conduct a triennial audit regarding the current and future condition of assets, as well as the assurance of rail safety through maintenance.

cible

Approach and Results

The assignment comprises three stages:

  • Audit of the preservation of operational safety through asset maintenance;
  • Assessment of maintenance policies;
  • Modelling of network performance trends based on the investment trajectory.

The assessment of maintenance needs relies on mesoscopic modelling of network infrastructure and the use of the Eqylibr® simulation platform developed by IMDM.

Key figures:

Audit contribution to the negotiation of €1.5 billion in additional investment dedicated to halting infrastructure ageing from 2028 onwards.

Is your organisation facing any of these situations?
Contact usarrow
Switzerland
6, rue des Deux-Gares
CP 553
1800 Vevey
France
11, rue de Paradis
75010 Paris
Portugal
SWI2M – IT company of IMDM,
Startup Madeira,
C. da Penteada, freguesia de São Roque
9020-105 Funchal
© 2026 IMDM | powered by tokiwi
linkedin
to top