Asset management strategy for the electrical grid

Assist SIN in developing the strategic asset management plan for the low-voltage network.

Client
SIN
Location
Nyon, Switzerland
Date
2021/2023
Asset management strategy for the electrical grid triangle
cible

Context and objectives

The equipment on SIN’s distribution network has considerable longevity, but replacing it generates substantial capital expenditure. It has become essential to organise investment in step with the energy strategy scenarios of the City of Nyon.

The assignment aims to:

  • Model the LV electricity network across several districts of Nyon
  • Analyse a full year of load measurements
  • Analyse current energy demand and assess future demand
  • Model electric vehicle charging points
  • Select the target network that will meet energy demand
  • Calculate the investment required to reach that target network
  • Establish sustainable asset management
cible

Approach and results

The study is based on analysing energy requirements for the area served through to 2035, taking account of territorial characteristics (residential, industrial, commercial). Its conclusions will produce a database of load profiles simulating various scenarios towards carbon neutrality, in line with the federal Energy Strategy 2050.

Results will first be validated on a section of the network before being generalised.

Tools used

Is your organisation facing any of these situations?
Contact usarrow
Switzerland
6, rue des Deux-Gares
CP 553
1800 Vevey
France
11, rue de Paradis
75010 Paris
Portugal
SWI2M – IT company of IMDM,
Startup Madeira,
C. da Penteada, freguesia de São Roque
9020-105 Funchal
© 2026 IMDM | powered by tokiwi
linkedin
to top