Assist SIN in developing the strategic asset management plan for the low-voltage network.
The equipment on SIN’s distribution network has considerable longevity, but replacing it generates substantial capital expenditure. It has become essential to organise investment in step with the energy strategy scenarios of the City of Nyon.
The assignment aims to:
The study is based on analysing energy requirements for the area served through to 2035, taking account of territorial characteristics (residential, industrial, commercial). Its conclusions will produce a database of load profiles simulating various scenarios towards carbon neutrality, in line with the federal Energy Strategy 2050.
Results will first be validated on a section of the network before being generalised.