Assessment of public lighting networks

Assistance in drafting a proposal to acquire the public lighting systems of several municipalities.

Client
SEIC
Location
Gland, Switzerland
Date
2021/2022
Assessment of public lighting networks triangle
cible

Context and objectives

Several municipalities wished to entrust SEIC with managing the renewal and maintenance of their public lighting infrastructure.

The assignment aimed to:

  • Take inventory of the network assets
  • Value the networks
  • Calculate future investment under several scenarios
  • Calculate maintenance costs for each scenario
  • Calculate the profitability of each scenario and the overall cost per lighting point
cible

Approach and results

The approach was based on analysing existing data and assessing the installed asset base. This work produced several “all-LED” modernisation scenarios phased over five or ten years.

Each scenario was subjected to comparative analysis based on annual costs and revenues. Calculating profitability and unit cost per lighting point made it possible to identify the economically optimal scenario.

Tools used

Eqylibr® Scenario® platform for asset management simulation

Is your organisation facing any of these situations?
Contact usarrow
Switzerland
6, rue des Deux-Gares
CP 553
1800 Vevey
France
11, rue de Paradis
75010 Paris
Portugal
SWI2M – IT company of IMDM,
Startup Madeira,
C. da Penteada, freguesia de São Roque
9020-105 Funchal
© 2026 IMDM | powered by tokiwi
linkedin
to top