Asset management strategy for the electrical grid

Development of an asset management strategy for the electricity grid, assessing the impact of the energy transition.

Client
SEIC
Location
Gland, Switzerland
Date
2025
Asset management strategy for the electrical grid triangle
cible

Context and Objectives

The Swiss Confederation has set ambitious targets for photovoltaic (PV) energy generation. By 2035, PV generation is expected to be approximately eight times higher than in 2022.

A distribution system operator must ensure its grid can accommodate this influx of power and subsequently plan the necessary investments over a 10-year horizon.

cible

Approach and Results

The assignment involves the following steps:

  • Creation of a digital twin of the grid using the client’s GIS tool;
  • Calculation of rooftop PV potential;
  • Development of PV generation growth scenarios;
  • Calculation of PV hosting capacity over a 10-year horizon using a probabilistic approach;
  • Deployment and configuration of the application.

The results obtained are as follows:

  • Assessment of network constraints: location and likely timeframe;
  • Estimation of appropriate measures;
  • Development of the investment plan.
Is your organisation facing any of these situations?
Contact usarrow
Switzerland
6, rue des Deux-Gares
CP 553
1800 Vevey
France
11, rue de Paradis
75010 Paris
Portugal
SWI2M – IT company of IMDM,
Startup Madeira,
C. da Penteada, freguesia de São Roque
9020-105 Funchal
© 2026 IMDM | powered by tokiwi
linkedin
to top